Simulation Session Time (SST) Clock time from prebrief start through conclusion of formal debrief
?
SST is the clock time from the start of the prebrief (or demonstration for procedural work) to the conclusion of the formal debrief. All phase baselines are anchored to one hour of SST. TDL scales linearly with SST; TDP does not scale linearly because development effort for a two-hour scenario is not twice the effort of a one-hour scenario.
hours

Development Phase (TDP)

?
TDP is the sum of all projected labor hours for intellectual and creative work from request acceptance through scenario material approval. Includes needs assessment, learning objective development, literature review, SME consultation, scenario scripting, assessment creation, pilot, and revision. Baseline: 1.36 hrs per SST hour.
--

Preparation Phase (TPP)

?
TPP is the sum of all projected labor hours for preparation from initiation of prep activities through learner ready. Includes equipment assembly and procurement, programming, room setup, standardized patient scheduling and training, and travel. Baseline: 1.36 hrs per SST hour.
--

Delivery Phase (TDL)

?
TDL is the sum of all projected labor hours from staff arrival on the day of delivery through conclusion of the final debrief. Includes same-day setup, prebrief, simulation run time, debrief, and teardown. Baseline: 1.00 hr per SST hour. TDL scales linearly with SST.
--

Post-Event Phase (TPE)

?
TPE is the sum of all projected labor hours from the start of physical teardown through completion of all obligations. Includes equipment cleaning, survey review and analysis, post-event consultation, and reporting. Baseline: 1.16 hrs per SST hour.
--

Simulation Modality Modifier (ModM)
?
ModM is a global modifier applied to TLH after all phase-level multipliers are summed. It reflects the distinct operational profile of each simulation modality across all phases. When multiple modalities are present, use the highest value. Applied in the Effort formula: Effort = TLH × ModM / SST.

When multiple modalities are present, use the highest value.

Modality applied after phase sums

ModM is a global modifier on TLH. It reflects the distinct operational profile of the modality across all four phases, not a per-phase adjustment.

Forecast Output

--hrs
-- hrs / SST
--
--hrs
--hrs
--hrs
--hrs

Confidence Band (plus or minus 33% — Modified Delphi Derived)

Enter values above to generate forecast range.

Calculation trace

TDP = 1.36 x CM x EB x SD
TPP = 1.36 x SC x SP_M
TDL = 1.00 x FC x IP x LSX
TPE = 1.16 x DM x SR x TDM
TLH = TDP + TPP + TDL + TPE
Effort = TLH x ModM / SST